flooring over a few days

Secţiunea dedicată jocului FIFA 09

by qizhen0809 » Sun Oct 22, 2017 10:19 am

<p>material selection. To prevent the moth-eaten, one is to buy through the drying kiln steaming process to produce the floor, although the price is more expensive, but the wood has been killed in all the eggs; the second is carefully selected keel, where there are insects or bark Never use it. Grilled: Some flooring over a few days, there will be </p>
<p>a large gap between the slats. This is mostly related to the high moisture content before the laying of the floor, due to indoor high temperature or air drying and shrink. Pay attention to the floor before the laying of water content in the 8% -13% range, and after the shop to be timely oil. Sound: As the quality of the floor laying is not high, </p>
<p>people walking around will find the squeaky sound, after hearing very uncomfortable. To this end, we should pay attention to the keel and the ground, between the floor and keel firmly, with the number and length of nails appropriate. At the same time, to prevent the keel spacing is too large or moisture content is too high, otherwise the </p>
" best patio furniture floor install , Vinyl Fence Review , how to build a curved patio block bench , how many linear feet is a standard wood fence section "
qizhen0809
Veteran
 
Posts: 708
Joined: Mon Sep 04, 2017 5:27 am

Return to FIFA 09

Who is online

Registered users: Google [Bot]

Contactaţi-ne!